Bayshore Town Center – Silver Spring Garage (South Parking Structure) is just off Silver Spring Drive on the south side of the mall in Glendale, WI. Hunzinger served as the Construction Manager for this massive reinvention of Bayshore Mall. Hunzinger Construction Company built this three-level parking deck with 561 parking stalls, 203,694 SF of total parking area.
The Silver Spring Garage was designed to maximize space for vehicles while minimizing initial direct cost to the owner. The deck was built on driven piles and concrete pile caps/grade beams. The structure designed to accommodate a future 4th level.
Bridges at north and south ends connect the parking deck to multi-tenant retail and office buildings. Hunzinger completed the project two months ahead of the initial 10 month schedule.
The 21st century makeover and creation of the new Bayshore Town Center included construction of 13 new buildings were integrated with the existing mall to create a pedestrian-friendly shopping experience. The new center includes over 1.1 million square feet of mixed use space and was designed by Development Design Group (DDG) of Baltimore, Maryland and Eppstein Uhen Architects of Milwaukee.
Mike Mesenbourg
Steiner & Associates Bayshore Town Center