CUNA Mutual Group E-Ramp & Health Clinic at CMG Corporate World Headquarters Campus located at 5910 Mineral Point Road in Madison, WI.  Hunzinger served as the Construction Manager on the demolition of a 96,000 SF, 2-level below grade parking garage and worked to reconstruct an 80,500 SF surface parking lot. Hunzinger also worked on a new single level 1,834 SF health clinic designed by Plunkett Raysich Architects Madison office.  Pierce Engineers were the project engineers on this complex project that involved the demolition of the parking structure while the campus and its primary walkways remained open to pedestrians.

Hunzinger crews completed some selective demolition, the rough and finish carpentry and all the concrete work. This project was challenging because the duct package, with all their electrical power, ran through the parking ramp that we took down. CMG did not lose any work time from power interruptions.